PROGRESSIVE ENGINEERING COONSITE PRECAST CONCRETE SOLUTIONS Request Project Assessment
Home › Projects › Balmer Lawrie Container Depot
Case Study · Container Depot

Balmer Lawrie Container Depot, Visakhapatnam — depot operational areas

ProjectManufacturing, Supplying & Laying of M-50 Grade Paver Blocks as per IS 15658, 100 mm thick, 100 × 200 mm brick shape, at Balmer Lawrie Container Depot, Visakhapatnam, A.P.
Product100 mm brick-shape pavers (100 × 200 mm), M-50 grade, IS 15658
Our scopeManufactured, supplied and laid
SectorContainer depot / port logistics
LocationVisakhapatnam, Andhra Pradesh
Client typePublic sector undertaking

The project

Balmer Lawrie's container depot at Visakhapatnam needed paver pavement across its operational areas: M-50 grade, 100 mm thick, in the 100 × 200 mm brick shape, to IS 15658. Our scope covered the whole chain, from manufacturing the blocks to supplying and laying them.

Container depots are unforgiving. Reach stackers, trailers and forklifts load the surface unevenly, and water that sits on a pavement near the coast does no favours to the sub-base.

Why workmanship decided this job

On a depot, the difference between a pavement that lasts and one that needs attention in a year is often not the block. It is the gaps, the compaction, the levels and the lines. Get the levels wrong and water ponds. Leave the gaps inconsistent and the pattern opens up under turning loads.

Our crews laid to line and level, compacted, and spread and brushed jointing sand into the gaps before each area was handed over. It is slow, repetitive, unglamorous work, and it is the reason the pavement behaves under traffic.

Photos

From the site

Finished brick-shape paver pavement at a container depot yard
Brick-shape pavers across the depot yard.
Close view of laid pavers with jointing sand
Close view: joints filled and brushed.

Planning a similar project?

Send your BOQ and site location, and we will come back with a preliminary view on onsite production.