Home › Projects › Dhamra Port (Adani Ports)
Case Study · Port · Adani Ports

Dhamra Port, Odisha — 2,50,000 sqm of M-50 paver pavement for Adani Ports

ProjectManufacturing, Supplying and Laying Unipaver blocks of size 250 mm (L) × 125 mm (B) × 80 mm (H), M-50 Grade as per BS 6717 at Dhamra Port, Odisha
ClientAdani Ports, Dhamra
Quantity2,50,000 sqm
AreasInternal roads, truck parking and steel stackyard
Year2021
AcceptanceVibratory roller test on the finished pavement, passed without cracking

The project

Dhamra is a working port on the Odisha coast, and the pavement it needed was the kind that takes a beating: internal roads, truck parking, and a steel stackyard where heavy coils and plates are stored and moved every day. The specification was 80 mm unipaver blocks, 250 × 125 mm, M-50 grade, to BS 6717.

The quantity was 2,50,000 square metres. At that scale, and that far from any established precast factory, buying blocks and trucking them in was never a sensible option. We set up production at the site, and our own crews laid what we made.

Remote site, extreme weather

Two things made Dhamra hard. The first was distance: it is a very remote location, so everything from spares to cement had to be planned well ahead. The second was the weather. That stretch of coast sees extreme monsoons and frequent cyclones, and there were days when our production area stood under water, press and mixer included.

We do not hide those photos; they are some of the ones we are proudest of. A site plant in a place like this is only as good as the team's ability to protect it, wait out the water, check it properly and start again. I have written more about that in what extreme weather teaches you about on-site precast.

Quality and the finished pavement

Production at Dhamra ran under the project’s QC plan, agreed with the client before regular production started: what gets tested, how often, and what happens to a batch that does not pass. Having that settled up front meant the arguments that usually come later simply did not come.

The laid pavement was then put through the vibratory roller test across the roads and the stackyard, which is about as direct a way to show a pavement’s strength as there is. It came through without cracking. More on that in what the vibratory roller test tells you about a paver.

Photos

From the site

Vibratory roller test on the laid M-50 unipaver road at Dhamra Port
Vibratory roller test on a finished internal road, passed without cracking.
Finished paver pavement in the steel stackyard at Dhamra Port, with conveyors behind
The steel stackyard, paved.
Freshly pressed unipavers on a pallet at the site plant, Dhamra
Fresh unipavers off the press at site.
Cured paver blocks stacked at the Dhamra site yard
Cured stock stacked at the site yard.
Site production area at Dhamra under monsoon floodwater, block press standing in water
Monsoon floodwater across the production area.
Long straight paver road with kerbs at Dhamra Port
A finished internal road.

Planning a similar project?

Send your BOQ and site location, and we will come back with a preliminary view on onsite production.