Projects

Project Experience

Selected work delivered with our onsite manufacturing model, for clients that include public sector undertakings and major private companies.

Jalna Dry Port, Maharashtra — heavy duty paver pavement

ProjectManufacturing, Supplying & Laying of M-55 Grade Paver Blocks as per IS 15658, 120 mm thick, unipaver in shape, at Jalna Dry Port, Maharashtra
Product / scope120 mm unipavers, M-55 — manufactured, supplied & laid
SectorContainer terminal / dry port

Challenge: Container storage and handling areas take loaded trailers and handling equipment daily. Low-strength blocks crack and break once traffic is released — the pavement had to prove itself before handover.

Our solution: 120 mm thick M-55 unipavers manufactured under our quality system and laid to line, level and compaction with proper jointing sand.

Quality control: Batch-wise testing during production; the finished pavement passed the vibratory roller test — rigorous exposure to a vibratory soil compactor — and was handed over without cracking.

About our paver blocks →

Balmer Lawrie Container Depot, Visakhapatnam — depot operational areas

ProjectManufacturing, Supplying & Laying of M-50 Grade Paver Blocks as per IS 15658, 100 mm thick, 100 × 200 mm brick shape, at Balmer Lawrie Container Depot, Visakhapatnam, A.P.
Product / scope100 mm brick-shape pavers — manufactured, supplied & laid
SectorContainer depot / port — Visakhapatnam, Andhra Pradesh

Challenge: Depot pavement with proper gaps, compaction, level and lines — workmanship directly determines drainage, ride quality and pavement life under container traffic.

Our solution: Experienced laying crews working to line and level; jointing sand spread and brushed into the gaps before handover of each area.

About our paver blocks →

NTPC Sipat — heavy kerb blocks cast onsite

ProjectConstruction of Road Shoulder at NTPC Sipat
Product / scopeHeavy duty kerb blocks 500 × 300 × 250 mm (~110 kg each) — manufactured onsite for plant road shoulders
SectorPower plant infrastructure

Challenge: Large, heavy kerb blocks in project quantities — traditional shutter-cast kerbs are slow, inconsistent in shape and expensive to transport at ~110 kg per block.

Our solution: Our mobile plant was installed at the site and the blocks were vibro-pressed on the automatic plant — fixed uniform shape, controlled water-cement ratio, smooth finish and maximum density with no honeycombing — avoiding long-distance transport of these ~110 kg blocks altogether.

About our kerb stones → · About the mobile plant →

Amaravathi, Andhra Pradesh — chequered tile cable covers

ProjectInfrastructure Development works at Amaravathi, Andhra Pradesh
Product / scope300 × 300 mm chequered tiles as cable route protection covers — cast onsite
SectorUtility / urban infrastructure

Challenge: Long underground power cable routes needed continuous protective covering — large tile quantities, delivered in step with cable-laying progress across zones.

Our solution: Tiles wet-cast and demoulded at site with clean finish, stacked zone-wise and laid over the routes as the ducts were backfilled.

About our chequered tiles →

NMPA, Mangalore, Karnataka — paver pavement repair & re-laying

ProjectPavement repair works at Berth No. 5, 6 & 7 at NMPA, Mangalore, Karnataka
Product / scopeRepair & re-laying of in-service paver pavement — berth yards and roadways
SectorPort — Mangalore, Karnataka

Challenge: Sections of the paver pavement at Berth No. 5, 6 & 7 had sunk and were holding water — ponding across yards and roadways after rain, with broken patches worsening under daily traffic.

Our solution: The affected areas were opened up, the sub-base rectified and compacted, and the pavement re-laid to line and level with jointing sand worked into every joint — bringing the areas back into service.